•6 min read•December 5, 2023What to Expect: Your Bathroom Remodel Timeline
By KimberTec Planning Team
How long does a bathroom remodel really take? Here's what to expect for a typical full bathroom renovation.
Before Construction Begins (2-6 weeks)
- Design & Planning: 1-2 weeks (or longer for custom designs)
- Material Selection: 1-2 weeks (tile, fixtures, finishes)
- Permits: 1-3 weeks (if required for plumbing/electrical changes)
- Ordering Materials: 1-4 weeks (depends on availability)
Week 1: Demolition & Rough-In
Days 1-2: Demo
- Remove old fixtures, vanity, tile, and flooring
- Haul away debris
- Inspect for hidden issues (mold, old plumbing, structural concerns)
Days 3-5: Rough-In Work
- Update plumbing lines (if needed)
- Run new electrical wiring
- Install new vent fan ducting
- Frame any new walls or shower curbs
Week 2: Waterproofing & Drywall
- Install cement backer board in wet areas
- Waterproof membrane in shower
- Hang and tape drywall
- First coat of joint compound
- Inspections (if required)
Week 3: Tile Installation
- Set floor tile
- Install shower/tub surround tile
- Grout (allow to cure 24-48 hours)
- Seal grout and natural stone
Week 4: Fixtures & Finishing
- Install vanity and countertop
- Set toilet
- Install shower door or curtain rod
- Mount faucets, showerhead, and hardware
- Install lighting fixtures
- Paint walls and trim
- Install mirrors and accessories
- Final walkthrough and touch-ups
Total Timeline Summary
- Small powder room: 1-2 weeks
- Standard full bath: 3-4 weeks
- Large primary bath: 4-6 weeks
- Complete gut/layout change: 6-8 weeks
What Can Slow Things Down?
- Material delays or backorders
- Discovering hidden issues (rot, mold, outdated plumbing)
- Permit delays
- Weather (for exterior venting or if materials are exposed)
- Change orders mid-project
Tips for a Smooth Project
- Plan ahead: Select all materials before demolition starts
- Expect the unexpected: Budget 10-15% contingency
- Set up a temporary bathroom: If it's your only one
- Communicate: Daily check-ins with your contractor
- Be flexible: Minor delays are normal
Ready to start your bathroom remodel? Schedule a consultation for a detailed timeline and quote.